Quick packer checks using the UK “3 packer rules” (Average, TNE, and Maximum Error).
3 packer rules
Average Quantity Rule: On average, the actual contents (weight or volume) of all packages in a batch must equal or exceed the nominal quantity stated on the label.
Tolerable Negative Error (TNE) Rule: Only a small percentage of packages in a batch are allowed to be slightly underweight (below the nominal quantity by a defined amount called the Tolerable Negative Error, or TNE).
Maximum Error Rule: No single package can be underweight by more than twice the Tolerable Negative Error (TNE).
Resource
Barcode Checker
Barcode Checker
Scan and compare barcodes (reference vs check), or generate a barcode for manual verification.
Barcodes render using CODE128. Most scanners will paste into the field automatically.
Reference
Check
Resource
AQL Calculator
AQL Calculator
Calculate sample size and accept/reject points from lot size, inspection level, and AQL values.
Resource
SG Cup Calibration
SG Cup Calibration
Calibrate an SG cup using water density vs temperature, check tolerance (PASS / FAIL), and generate a correction factor.
Actual volume = weight ÷ water density. PASS if |deviation %| ≤ tolerance.
Resource
Julian Code
Julian Code
Convert a date into a Julian code (YYYYDDD), and validate scanned codes (YYYYDDD / YYDDD / DDD).
Resource
QR Generator
QR Generator
Generate a QR code for a URL or any text (great for station work instructions).
Print and post at a station, or scan to open.
Resource
Go / No-Go (Printable)
Go / No-Go (Printable)
Enter nominal and tolerances, then type/scan a measured value to get an instant PASS/FAIL. Use Print to post limits at a station.
Resource
Tolerance Calculator
Tolerance Calculator
Calculate min/max limits from nominal and tolerances.
Resource
Unit Converter
Unit Converter
Quick conversions for common manufacturing units.
Resource
Defects Metrics
Defects Metrics
Calculate DPU, PPM, and DPMO.
Resource
Process Capability
Process Capability
Compute Cp/Cpk from mean, sigma, and spec limits.
Resource
Takt Time
Takt Time
Calculate takt time from available minutes and demand.
Resource
OEE Calculator
OEE Calculator
Compute overall equipment effectiveness from A/P/Q percentages.
Resource
I-MR Quick Limits
I-MR Quick Limits
Paste measurements to estimate I-MR chart limits (handy for quick checks).
Resource
Gage R&R (Quick)
Gage R&R (Quick)
Estimate %GRR and NDC using EV/AV/PV inputs.
Resource
Torque Converter
Torque Converter
Convert torque units and estimate preload (optional) from K and diameter.